The cost of developing new onshore wind farms in Ireland could fall by almost 23% if the Government and state agencies implemented seven policy changes, according to a report by consultancy Baringa commissioned by Wind Energy Ireland. The measures address grid connection costs, renewable energy support contracts, energy storage and the amount of wind power lost when the electricity system cannot accommodate available generation.
The report, Lower Bills, Cleaner Power, estimates that implementing the recommendations ahead of Ireland’s fifth Renewable Electricity Support Scheme (RESS 5) auction could have reduced the average price secured by wind projects from €97 to €69 per megawatt-hour (MWh). This would have generated an estimated €120 million in savings for electricity consumers over the lifetime of the contracts awarded in that auction.
Baringa identifies financing as the largest component of a typical Irish onshore wind farm’s levelised cost of electricity, accounting for 42% of the total. The consultancy argues that policy uncertainty increases the risk perceived by lenders and investors, raising financing costs and, ultimately, the price of electricity generated by wind farms.
The seven proposed changes are aimed at reducing these costs and risks. They include streamlining grid connection requirements so that technical specifications reflect the electricity system’s actual needs without compromising security or reliability, and providing long-term certainty on grid charges by fixing Transmission Use of System (TUoS) charges and Transmission Loss Adjustment Factors (TLAFs) from the date of a project’s final investment decision.
The report also recommends extending RESS support contracts from 15 to 20 years to provide greater revenue certainty, and fully indexing those contracts to inflation, rather than the current arrangement under which only 30% of their value is indexed. Baringa estimates that full indexation alone could have reduced the RESS 5 auction price by €15/MWh.
The remaining measures focus on reducing the amount of renewable electricity that cannot be used by the grid. Baringa calls for removing barriers to hybrid connections, allowing co-located batteries to charge directly from wind generation; supporting the deployment of long-duration energy storage (LDES); and introducing a coordinated Dispatch Down Action Plan combining grid investment and operational measures with demand-side flexibility, interconnection, dynamic line rating, hybrid connections and long-duration storage.
The report also considers the potential of repowering existing wind farms, a measure separate from the seven proposed policy changes. It notes that the removal of barriers preventing repowered projects from qualifying for support in the upcoming RESS 6 auction could allow developers to reuse existing site infrastructure. Baringa estimates that repowering alone could reduce development costs by more than 11% in the absence of the other measures.
Although the analysis focuses on onshore wind, Baringa says most of the policies examined could also lower development costs for offshore wind and solar projects. The consultancy concludes that implementing the recommendations would help reduce project risks and costs, with potential benefits for electricity consumers.