España aprueba su mayor planificación eléctrica, con 17.142 millones de inversión hasta 2030
A proposed Franco-German agreement on the automotive sector could secure only 13% of Europe’s planned battery cell production by 2030, putting the region’s battery manufacturing ambitions at risk, according to an analysis published by Transport & Environment (T&E) on 19 November 2026. The organisation warns that weaker EU local-content requirements and proposals to ease vehicle emissions targets could shift demand towards foreign suppliers and undermine investment in Europe’s battery value chain.
The analysis estimates that around 100 GWh of battery cell demand, equivalent to approximately 1.5 million electric vehicles, and 250 GWh of cathode active material demand could move outside Europe by 2030 under the proposed rules. T&E argues that the Franco-German deal would secure a smaller share of the market than existing conditions, as more than 50% of battery cells used in electric vehicles sold in the EU are already manufactured in Europe.
Under the proposed agreement, EU-made battery cells would be required in only 10% of eligible vehicles in 2028 and 2029, rising to 20% in 2030 and 2031, before reaching 70% from 2032. T&E estimates that this framework would secure cell production equivalent to around 900,000 electric vehicles in 2030, compared with 4.6 million under a stricter Made-in-EU approach within the proposed Industrial Accelerator Act (IAA).
The organisation also highlights the potential impact of changes to EU vehicle emissions rules. According to its analysis, proposals by the European Parliament to weaken emissions reduction requirements could reduce demand for EU-made battery cells by 247 GWh between 2027 and 2032, equivalent to the batteries needed for approximately 3.7 million electric vehicles manufactured in the EU. T&E compares this volume with almost three times the annual production capacity of LG Energy Solution’s plant in Poland, which it identifies as Europe’s largest battery factory.
The potential effects extend beyond battery cell manufacturing to the production of key components. T&E says that a broad scope for free trade agreement (FTA) partners under the IAA could allow lower-cost countries to capture demand before European manufacturers. By contrast, the organisation estimates that stricter Made-in-EU requirements could generate 323 GWh of additional demand for EU-made cathode active materials, bringing total demand to 407 GWh and securing 94% of expected EU supply by 2032.
The report also raises concerns about projects that have yet to begin production, as most of the battery cell capacity expected in Europe by 2030 comes from factories still in the development or ramp-up stages. T&E identifies facilities such as Lyten, formerly Northvolt, in Sweden, PowerCo Salzgitter in Germany and Verkor Dunkirk in France as projects whose prospects could be affected by the proposed changes.
In response, T&E is calling on EU policymakers to reject the Franco-German proposal on batteries and maintain the timelines and battery requirements included in the European Commission’s IAA proposal. It also advocates for a strict Made-in-EU scope, or a limited list of trusted partners comprising the EU27, the European Economic Area (EEA) and the UK, alongside maintaining the existing vehicle CO2 reduction standards without further weakening them.
Franziska Grüning, Raw Materials Officer at T&E, said that securing a European battery value chain, from mining to manufacturing, should be a priority for EU leaders, warning that weaker local-content incentives could undermine the development of domestic production and the jobs associated with it.





Comentarios
Sé el primero en comentar...